Is radiographic examination (RT) applicable to socketwelds on piping? I have found sources on both sides.
Specifically, I'm concerned about a carbon steel (A106B, sch 80) piping system with class 3000 forged steel (A105) socketweld fittings, 1.5" NPS, handling high-pressure steam condensate. Design pressure is 250 psig, design temperature is 500ºF.
Owner requested 100% RT as well as a pressure test on the portion of the system that will be underground. Contractor claims socketwelds can't be examined by RT.
You can see anything internally you want to see on RT of a socket weld and coupled with a good VT of a clean weld you can wee everything you need to see. Most contractors do not understand or want to understand the capability of an RT inspection. They will have a hundred arguments why RT is going to cost you money and slow them down.
All contractors will claim to have gobs of experienced welders that are capable of correctly welding sockets and there is no need to RT as it want show nothing. One will find this is not the case 99% of the time. As one looks at enough socket weld radiographs one gets to know the welder and how good or bad they are.
In the same process area of my post in the referenced thread recent modifications resulted in approximately 500 new socket welds on new and existing piping that were only going to have RT at 25% to save money again. The construction group went through the whole song and dance again. There was a clause in the contract that anything over 5% rejects would trigger 100% RT. This happened on the first pass of RT and Visual. The initial problem stemmed from not cleaning the existing pipe and trying to use 7018 in lieu of 6010. This coupled with single pass welding was trouble.
My experience over the years has been that contractors see sockets as a money maker by initially agreeing to the contractual requirements and then trying worm out of same when fabrication starts.
Just remind them that bad welds are what slows a project down.
We don't want nor is there is a desire or need to have a butt welded
system in this process area though about 20-30% of the welds are butt
welds. As stated before this system is for a heating media, Vaporized
Therminol @ 70 psig and up to 700F. This vapor system where we
essentially use on the latent heat is a legacy system that started with
mainly 1/2" and 3/4" piping and has now been replaced by 3/4" through
1-1/4" piping due to increase in throughput. For a total of 17 process
lines where conservatively there are over a 100,000 socket welds. This
system was conceived in 40's by people a hell of lot smarter
than me and the decision was to go with sockets instead of Acetylene
welded butt joints. Socket welds have served us well since plant
start-up in 1952. There has been one major spill/leak of vaporized
Therminol, 22 gals, from a piping failure and that was where a welder
made an ill conceived correction to correct a mistake.
It is only
in the last fifteen years or so that we have trouble with pipe
fabrication when using socket welds by project contractors. Our own
welders and welders from the on-site maintenance group have no trouble
at all with socket welds. All our piping specifications for the
Therminol system are very specific as to our requirements and have stood
a test in court. We have on-site radiographs and sectioned fittings,
aside from the drawings, that are available for inspection prior,
during, and after one starts fabrication. We have data,
time studies, showing that it takes no more time to do it right
including RT than to screw up. These samples show the gap and insertion,
fusion, porosity, 2 pass welding and appearance requirements.
One
reason for such strict requirements is that the majority of the system
is in building where a one time 2000 people were working and any leak
could result in catastrophic vapor cloud
explosion(detonation). This is a real possibility that has been looked
at by two international experts on same, the loss prevention departments
of two major chemical companies, and the insurance people. Another
reason was that for several years a recordable spill was 2 ounces,
whether liquid or vapor, and the exposure limit was also very low. Both
exposure limits and reportable limits have been raised to a more
achievable level, we still don't like leaks.
To mitigate the above
hazards the system the piping specification for Therminol also requires
the use of RTJ flanges, double globe valves(reversed) and new ring
gaskets anytime a flange is made up.
All we have ever asked is
that one bids on the job as specified and get it right the first time
without trying any shenanigans. It's not the question of what might be
better, cheaper, quicker, or faster it's doing the job as specified with
competent people at which point we will inspect and make the call, good
or bad. If you need to know any fabricators excuses just let me know as
I have book full.